Reports until 16:27, Friday 11 February 2011
H2 INS
patrick.thomas@LIGO.ORG - posted 16:27, Friday 11 February 2011 (549)
Ops Shift Summary
Restarted fmcs epics channels. There was a problem with the controls account missing the path to the caRepeater. It is unknown why it would have changed after the power outage.

Dale gave a tour

Surveying continued for HEPI

Oscar was bailing tumbleweeds

Construction of shelving continued in the EE lab

Michael R. capped the conduit holes from the H2 PSL

A truck went through the gate, but did not contact the control room. It may have been here to pick up the recycling.