SHIFT SUMMARY: Three fast locklosses over the course of the shift, not sure as to the cause.Currently re-locking at ACQUIRE_DRMI_1F.

LOG: 

16:57 (08:57) GRB 363095 -- trigger duration too long

17:08 (09:08) Ed to Optics Lab

17:19 (09:19) Ed out of Optics Lab

18:04 (10:04) Fast lockloss

18:34 (10:34) Tyler processing tumbleweeds on X-arm

19:55 (11:55) At NLN, going to Observing

21:41 (13:41) Going out of Observing for 0.5-1 hour of commissioning

21:49 (13:49) Tumbleweed work done for the day

22:07 (14:07) Fast lockloss

22:55 (14:55) At NLN, going to Observing

23:45 (15:45) Fast lockloss