TITLE: 02/07 Day Shift 16:00 – 00:00 (08:00-16:00), all times posted in UTC
STATE of H1: Locking
INCOMING OPERATOR: Jim
SHIFT SUMMARY: Did some SQZ troubleshooting, followed by commissioning. Lost lock at 22:40, been struggling to relock since then
LOG:
16:32 (08:32) Chandra to MX/MY -- do an inspection
17:15 (09:15) Leaving Observing to investigate SQZ oscillations
17:29 (09:29) Sheila to LVEA -- continue SQZ investigation
17:37 (09:37) Chandra back from MX/MY
17:55 (09:55) Sheila out of LVEA
18:00 (10:00) Starting scheduled commissioning break
19:27 (11:27) Done with commissioning, going into Observing
22:12 (14:12) Gerardo to MX/MY -- pick up equipment, inspect gauges
22:40 (14:40) Fast lockloss
22:45 (14:45) Gerardo back from MX/MY
22:47 (14:47) Chandra to LVEA
23:00 (15:00) Chandra out of LVEA
23:09 (15:09) Travis to Optics Lab
23:12 (15:12) Travis out of Optics Lab