TITLE: 02/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 117Mpc
INCOMING OPERATOR: Jim
SHIFT SUMMARY:
- quiet shift
- Robert and Rahul in control room
- Public tours through control room
- 23:20 Robert S attempting to blaze a trail through the tumbleweeds to get to EX for commissioning activities that have been coordinated with Livingston
- the plan was to begin at 23:30 - I haven't heard from him so far. Not sure of his progress down the arm
- Handing of to Jim
LOG: