We removed the rigid section of spool BE-3A and placed hard covers on each end and placed on pallets. We laid both of these sections down for safe storage. Hard covers were placed on the flanges of bsc 2 and ham 3 as well. We loosened all of the door bolts on ham 2 after a 1st cleaning and plan on removing those doors tomorrow.