Displaying report 1-1 of 1.
Reports until 08:05, Thursday 13 February 2020
LHO General
patrick.thomas@LIGO.ORG - posted 08:05, Thursday 13 February 2020 (55078)
Ops Owl Shift Summary
TITLE: 02/13 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 116Mpc
OUTGOING OPERATOR: Jim
CURRENT ENVIRONMENT: Lost lock transitioning to LARGE_EQ_NOBRSXY for earthquake in Japan. No major issues relocking.
    SEI_CONF state: WINDY
    Wind: 2mph Gusts, 1mph 5min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.43 μm/s 
QUICK SUMMARY:

08:29 UTC NLN. 
08:31 UTC Observing. No SDF differences.

08:58 UTC GRB-Short
Set INJ_TRANS to INJECT_KILL
E363867
Fermi
Trigger ID	603277076
TRIGGER_DUR:     0.016 [sec]
Confirmed with LLO
Stand Down

10:40 UTC Set SEI_CONF to LARGE_EQ_NOBRSXY for 6.7 mag. earthquake in Japan. Lost lock.
Pausing at READY, waiting for earthquake.

11:20 UTC Set INJ_TRANS to INJECT_SUCCESS.

12:15 UTC Set SEI_CONF to WINDY.
12:21 UTC Starting relocking attempt.
12:28 UTC Lock loss from LOCKING_ALS. Waiting at READY again for ground motion to settle more.
13:06 UTC Starting another locking attempt.
13:14 UTC Lock loss from ACQUIRE_DRMI_1F.
13:19 UTC Pausing at CHECK_IR. Adjusting COMM and DIFF.
14:03 UTC NLN.
14:06 UTC Observing. No SDF differences.

15:47 UTC Tyler to high bay.
Displaying report 1-1 of 1.