Displaying report 1-1 of 1.
Reports until 16:11, Saturday 15 February 2020
H1 General
yannick.lecoeuche@LIGO.ORG - posted 16:11, Saturday 15 February 2020 (55121)
Ops Day Shift Transition

Ops Shift Transition: 02/15/2020, Eve Shift 00:00–08:00 (016:00-00:00) - UTC (PT)

State of H1: Locking

Intent Bit: Commissioning

Weather: 10-35 mph wind

Primary 0.03 – 0.1Hz: 0.1 um/s

Secondary 0.1 – 0.3Hz: 0.9 um/s

Outgoing Operator: Camilla

Quick Summary: High wind/microseism preventing lock for the last 4 hours. Currently at ACQUIRE_PRMI.

Displaying report 1-1 of 1.