Displaying report 1-1 of 1.
Reports until 10:49, Tuesday 19 February 2013
H1 SUS
betsy.weaver@LIGO.ORG - posted 10:49, Tuesday 19 February 2013 (5525)
PR3- M2 AOSEM Brackets swapped

Late last week, Deepak and I precariously swapped the problematic and AOSEM brackets described in my previous alog:

https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=5499

 

I use the word precarious because the operation meant that tools, small fasteners, and hands were wedged inside of the suspension above the optic and extremely close to fragile wires in order to replace the 4 brackets.  This did not make me happy.  See some pictures below, but the collection is also posted  ResourceSpace: https://ligoimages.mit.edu/?r=23901

Images attached to this report
Displaying report 1-1 of 1.