HughR, JimW, some Apollo
This afternoon, after Jodi and Cheryl did their in-chamber cleanliness assessment, we removed the dummy payload from the HAM2 optical table (6x 50lb masses and 3 10kg masses). No other components were touched, so there maybe other components to be removed from the table before PR's are installed.