TITLE: 02/25 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 119Mpc
INCOMING OPERATOR: TJ
SHIFT SUMMARY:
A little lockloss here, some commissioning there, and a superevent candidate near the end. Environmentally, winds have died down & microseism is flattening out at a fairly nice and low-ish value.
LOG:
- 23:58-0:24 Trip to MY for photos (Gerardo)
- 0:02-0:04 Testing IFO_NOTIFY guardian node (Dave, TJ)
- 0:38 LOCKLOSS (22hr04min lock)
- There was a small rise in the earthquake band and the winds increased a little, but environment didn't look out of the norm.
- 1) Lockloss at DRMI
- 2) Lockloss at POWER_10W
- 0:55 PCAL lab (Rick, Dripta, Niko)
- 1:08 TCS Chillers (Corey)
- 2:17-3:06 Dark Offset Commissioning work (Sheila)
- 3:06 Back to OBSERVING
- 6:05:01 superevent S200225q (96% BBH candidate)