Reports until 17:52, Wednesday 16 February 2011
H2 General
jonathan.berliner@LIGO.ORG - posted 17:52, Wednesday 16 February 2011 (553)
Wednesday Ops Log
Highlights:
- Michael Rodruck boots h1psl OPC, shouldn't affect anything, just a backup system.
- Jackhammer work at HAM11 to free the chamber from the floor.  Much dust was kicked up by the process as sensed by the dust monitors in the LVEA.  The West Emergency Egress Door is remaining open as a hose passes from the outside to the hammering area.  Operators: ignore related alarms.
- Keita Kawabe, Conor Mow-Lowry turn PSL on, links laser by fiber to the squeezer by HAM6.  LVEA is laser hazard during this procedure.
- One load of elementary school kids visited the Control Room.
- Oscar finished baling tumbleweeds at ~3pm, usual time.
- No deliveries, to my knowledge.
- Hanford Fire Department was on site.