TITLE: 02/25 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Observing at 116Mpc INCOMING OPERATOR: Corey LOG: 15:35 - 15:39 UTC Tumbleweed chipping close to end X 15:45 UTC Dropped out of observing. Observatory mode set to CALIBRATION. Running PEM injection. 16:00 UTC Observatory mode set to PREVENTIVE MAINTENANCE. SEI_CONF to SC_OFF_NOBRSXY. 16:00 UTC Jeff B. to cleaning area 16:01 UTC Karen to end Y 16:02 UTC Fire department through gate 16:03 UTC Kyle WP 8546 16:04 UTC Vanessa to end X 16:04 UTC Gerardo to IP5 16:05 UTC Hugh to HAM8 16:07 UTC Betsy to LVEA 16:21 UTC Jeff B. to end stations for garb inventory 16:24 UTC Fire department through gate 16:30 UTC Richard, Ken, fire department to end X 16:32 UTC Vanessa at end X 16:34 UTC Filiberto to end X, laser safety relay 16:43 UTC Camilla and TJ to LVEA, turn off TCS X and squeezer, mechanical room, turn off chiller, replace filter, turn on chiller, turn lasers back on 16:45 UTC Chandra to LVEA 16:50 UTC Rick and Jason to PSL enclosure for FSS work 16:59 UTC Vanessa leaving end X and heading to LVEA 17:02 UTC Chandra back 17:03 UTC Karen done at end Y 17:15 UTC APS through gate to end X 17:20 UTC Desert Green through gate 17:33 UTC Niko to optics lab 17:36 UTC TJ back 17:48 UTC TJ and Camilla to LVEA to turn on TCS and squeezer lasers 17:52 UTC Paradise water through gate 17:54 UTC LN2 delivery through gate to tank 8514371 (CP7) (end Y) 18:05 UTC Rick and Jason done 18:09 UTC TJ and Camilla to CER mezzanine to check on TCS HV 18:10 UTC Gerardo WP 8547 Jason, Rick, Patrick to PSL enclosure to restart Beckhoff machine 18:50 UTC Jeff B. done and going to LVEA 18:53 UTC Filiberto to beer garden to take pictures 18:54 UTC Niko out of optics lab 18:55 UTC TJ and Camilla back 18:56 UTC Jim starting a measurement on end Y 19:03 UTC Jason tweaking beam alignment into PMC 19:08 UTC Ken and fire department to corner station to disable RAFAR 19:14 UTC Jason done 19:19 UTC Dave restarting H1SEIPROC and DAQ 19:24 UTC TJ renaming guardian node 19:27 UTC Filiberto done 19:34 UTC Marc and Dick to PSL racks Corner station SC turned back on 19:53 UTC Kyle done at end station 20:13 UTC Ken to LVEA entry way to get ladder 20:15 UTC Ken done 20:24 UTC Jeff J. back 20:26 UTC Gerardo done 20:39 UTC Jim done 20:44 UTC Dick and Marc back 20:45 UTC Starting relocking 20:46 UTC Observatory mode set to LOCKING 20:46 UTC Pepsi through gate 20:47 UTC Lock loss from LOCKING_ARMS_GREEN 20:48 UTC Tumbleweed chipping done 20:50 UTC Camilla done sweeping LVEA 21:14 UTC Fire alarm testing is complete. Richard to mid station. 21:24 UTC Tyler and Chris chipping tumbleweeds on X arm 21:28 UTC Lock loss from ENGAGE_SOFT_LOOPS 21:49 UTC Lock loss from POWER_10W 22:06 UTC APS through gate 22:10 UTC Lock loss from POWER_10W 22:59 UTC Observing 23:33 UTC Fire department, Ken and APS off site