Reports until 16:04, Tuesday 25 February 2020
LHO General
patrick.thomas@LIGO.ORG - posted 16:04, Tuesday 25 February 2020 (55302)
Ops Day Shift Summary
TITLE: 02/25 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 116Mpc
INCOMING OPERATOR: Corey
LOG:

15:35 - 15:39 UTC Tumbleweed chipping close to end X
15:45 UTC Dropped out of observing. Observatory mode set to CALIBRATION. Running PEM injection.
16:00 UTC Observatory mode set to PREVENTIVE MAINTENANCE. SEI_CONF to SC_OFF_NOBRSXY.
16:00 UTC Jeff B. to cleaning area
16:01 UTC Karen to end Y
16:02 UTC Fire department through gate
16:03 UTC Kyle WP 8546
16:04 UTC Vanessa to end X
16:04 UTC Gerardo to IP5
16:05 UTC Hugh to HAM8
16:07 UTC Betsy to LVEA
16:21 UTC Jeff B. to end stations for garb inventory
16:24 UTC Fire department through gate
16:30 UTC Richard, Ken, fire department to end X
16:32 UTC Vanessa at end X
16:34 UTC Filiberto to end X, laser safety relay
16:43 UTC Camilla and TJ to LVEA, turn off TCS X and squeezer, mechanical room, turn off chiller, replace filter, turn on chiller, turn lasers back on
16:45 UTC Chandra to LVEA
16:50 UTC Rick and Jason to PSL enclosure for FSS work
16:59 UTC Vanessa leaving end X and heading to LVEA
17:02 UTC Chandra back
17:03 UTC Karen done at end Y
17:15 UTC APS through gate to end X
17:20 UTC Desert Green through gate
17:33 UTC Niko to optics lab
17:36 UTC TJ back
17:48 UTC TJ and Camilla to LVEA to turn on TCS and squeezer lasers
17:52 UTC Paradise water through gate
17:54 UTC LN2 delivery through gate to tank 8514371 (CP7) (end Y)
18:05 UTC Rick and Jason done
18:09 UTC TJ and Camilla to CER mezzanine to check on TCS HV
18:10 UTC Gerardo WP 8547
Jason, Rick, Patrick to PSL enclosure to restart Beckhoff machine
18:50 UTC Jeff B. done and going to LVEA
18:53 UTC Filiberto to beer garden to take pictures
18:54 UTC Niko out of optics lab
18:55 UTC TJ and Camilla back
18:56 UTC Jim starting a measurement on end Y
19:03 UTC Jason tweaking beam alignment into PMC
19:08 UTC Ken and fire department to corner station to disable RAFAR
19:14 UTC Jason done
19:19 UTC Dave restarting H1SEIPROC and DAQ
19:24 UTC TJ renaming guardian node
19:27 UTC Filiberto done
19:34 UTC Marc and Dick to PSL racks
Corner station SC turned back on
19:53 UTC Kyle done at end station
20:13 UTC Ken to LVEA entry way to get ladder
20:15 UTC Ken done
20:24 UTC Jeff J. back
20:26 UTC Gerardo done
20:39 UTC Jim done
20:44 UTC Dick and Marc back
20:45 UTC Starting relocking
20:46 UTC Observatory mode set to LOCKING
20:46 UTC Pepsi through gate
20:47 UTC Lock loss from LOCKING_ARMS_GREEN
20:48 UTC Tumbleweed chipping done
20:50 UTC Camilla done sweeping LVEA
21:14 UTC Fire alarm testing is complete. Richard to mid station.
21:24 UTC Tyler and Chris chipping tumbleweeds on X arm
21:28 UTC Lock loss from ENGAGE_SOFT_LOOPS
21:49 UTC Lock loss from POWER_10W
22:06 UTC APS through gate
22:10 UTC Lock loss from POWER_10W
22:59 UTC Observing
23:33 UTC Fire department, Ken and APS off site