TITLE: 02/28 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Calibration
INCOMING OPERATOR: TJ
SHIFT SUMMARY:
Beginning of shift was focused on stabilizing the Squeezer and finishing off a calibration measurement. After that we went to Observing. End of the shift had an alert for an incoming EQ.
LOG:
- 22:10 Cal Line Comb test begins (& should go for ~2hrs)
- 0:10 - 0: 40 Trip to optics Lab (Rick, Jason, crew)
- 1:20-1:28 Niko in lab, too.
- ~0:40 Jenne gives OK for Squeezer.
- 1:17:00utc: Cal Line Comb test measurement stopped
- 1:17---Accidentally immediately went to Observing because GRD_IFO was in Automatic Operation. So I backed out to Commissioning for some lingering squeezing work and close out of the Cal measurement.
- 1:21 Sheila making adustments to squeezer before going back to Observing
- 1:29 Back to OBSERVING
- 2:00 PSL Chiller topped off (Corey)
- 7:00 GRB received & stood down for this one
- 7:49 Incoming EQ alert for 6.1 from Niue (south Pacific) w/ R-wave due to arrive in ~30min.