TITLE: 03/04 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Aligning
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Extended maintenance day today, many successful activities. Corey has started aligning.
LOG:
- 1307 Tumbleweeder starting and passing by VPW
- 1546 Out of Observing to run PEM injection.
- 1600 Bubba, Scott, Chris to LVEA to start HAM7 and door work
- 1600 Karen to EY
- 1605 Kyle, Chandra, Gerardo at EX
- 1606 Vanessa to EX
- 1607 Jeff B to EX, EY for dust monitor checks.
- 1610 Ken to LVEA to talk with Bubba
- 1628 Richard and Fil to EX for baffle PD electronics work
- 1629 Killed the lock at 89 hours and 36 minutes
- 1631 Chris and pest crew to EY, EX, and LVEA
- 1632 Rahul starting charge measurements
- 1635 Ken out of LVEA and will be opening OSB receiving roll up door
- 1657 Hugh to LVEA, looking to move HAM8 crossbeam
- 1701 Karen done at EY
- 1710 Richard, Fil to EY, done at EX
- 1714 Jeff B done
- 1727 Chris done with Pest crew and back into LVEA
- 1729 Richard, Fil done
- 1731 Jenne to LVEA to swap SQZ PZTs
- 1737 Norco at gate heading to MY (74)
- 1747 Hugh out
- 1802 Ken back into LVEA
- 1803 Charge measurements done
- 1812 Norco at gate heading to tank 76 at CS
- 1817 Vanessa done with EX, heading into LVEA
- 1833 Tripped all SEI platforms trying to recenter T240s and STSs
- 1843 Bubba out
- 1853 Dick and Marc to LVEA ISC racks
- 1920 Jeff J to LVEA
- 1922 Hugh, Patrick to EY to look at fence
- 1945 Richard done
- 1950 Fil to ISC racks
- 1952 Hugh, Patrick back
- 2006 LSC models restarted
- 2018 Bubba, and crew out
- 2115 Jenne to SQZ racks in LVEA
- 2118 Richard to EX to check on fire panel
- 2125 HFD on site
- 2144 Richard back
- 2144 Jeff J to LVEA
- 2153 Hugh to MX
- 2157 Jeff J out
- 2211 Hugh back
- 2218 Jenne to LVEA
- 2226 Jenne out
- 2253 Richard and APS back and done
- 2314 Ed to EY to pick up a computer
- 0000 SEI_ENV taken back to CALM, enabling the SC