Displaying report 1-1 of 1.
Reports until 13:10, Thursday 17 February 2011
H2 INS
patrick.thomas@LIGO.ORG - posted 13:10, Thursday 17 February 2011 - last comment - 10:08, Wednesday 23 March 2011(554)
dust monitors replaced
Yesterday Robert and I found that the pump in the mechanical room that pulls air for the dust monitors that have their internal pump removed was not pulling air. Today I read the flow on the attached flow meter as .15. This means that the data from locations 1 (ISCT4), 7 (H2 racks) and 10 (H1 PSL) has been invalid for an unknown period of time. Also possibly location 8 (H1 racks), which had been replaced with one with an internal pump earlier. So today I went and replaced locations 1, 7 and 10 with ones that have an internal pump. Note also that dust monitor 3 was moved yesterday into a clean room next to where the jack hammering is taking place. Also for a period yesterday, location 4 was moved onto the floor by the H1 PSL, but has been moved to location 8 today.

Locations of LVEA dust monitors:
1 ISCT4
3 Clean Room over BSC4
5 Beer garden
6 Diode room
7 previous location of H2 racks
8 H1 racks
10 H1 PSL
Comments related to this report
patrick.thomas@LIGO.ORG - 10:08, Wednesday 23 March 2011 (653)
3 moved into clean room over HAM 12
4 added outside clean room over HAM 12
9 added at H2 PSL area
Displaying report 1-1 of 1.