Reports until 16:04, Monday 09 March 2020
LHO General
corey.gray@LIGO.ORG - posted 16:04, Monday 09 March 2020 - last comment - 07:39, Tuesday 10 March 2020(55508)
Day Operator Shift

TITLE: 03/09 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Jim
SHIFT SUMMARY:

Started off shift with H1 making it to NLN.  Then there was the weekly Monday calibration measurements, some commissioning, and mostly observing today.  There was some tumbleweed work as well.  Tour will be visiting 
LOG:

Comments related to this report
rahul.kumar@LIGO.ORG - 17:38, Monday 09 March 2020 (55516)

I checked that the nominal (and max) gains for ETMX mode 13 and 16 is 30 (in the lscparams). However the gain which was applied was 40. I believe this to be a typo while feeding the gain or did you/Cheryl deliberately tried higher gain for damping them?

corey.gray@LIGO.ORG - 07:39, Tuesday 10 March 2020 (55520)

As noted in my log, I saw modes ringing up again at around the end of my shift, so I took the gains to 40 to see if this would take violins back down.  This is what I handed off to Jim last night.