TITLE: 03/11 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 119Mpc
INCOMING OPERATOR: Jim
SHIFT SUMMARY: Maintenance day. Not a tough recovery, but one lock loss before shift end.
LOG:
- 1439 Out of Observing to start a measurement
- 1440 Tyler starting Kobelco pump
- 1457 Karen starting to drive to EY
- 1500 Scott taking forklift to from OSB receiving to staging building
- 1500 Kyle to EX
- 1504 Vanessa to LVEA
- 1505 Richard to MX MY new WAPs
- 1505 Dave restarting PSLFSS model and DAQ restart
- 1512 Robert to EX and EY, making it laser hazard
- 1524 Betsy to LVEA to find 3IFO HWS
- 1534 Richard back
- 1537 Hugh to LVEA looking at HAMs and 3IFO
- 1553 Fil, Richard to LVEA to cable measurements
- 1608 Jenne to LVEA to flip a switch
- 1610 Vanessa to EX
- 1612 Jenne out
- 1621 Dick and Marc to LVEA at ISC racks
- 1624 Jenne back in to flip the switch back
- 1631 Norco at gate, heading to tank 75
- 1631 Bubba to LVEA with contractors
- 1649 Chandra to LVEA to check on HAM8 crew
- 1707 Sensor correction back on in CS to get DRMI
- 1712 Chandra out, heading to EX
- 1720 Robert into LVEA to transition the East Bay to laser hazard
- 1720 Tyler out
- 1724 Tyler to EX
- 1735 Robert, Cheryl, Jenne to LVEA
- 1745 Betsy to LVEA
- 1803 Cheryl transitioning the LVEA to laser hazard
- 1803 Chandra to LVEA
- 1832 Chris done
- 1837 Chris to LVEA to unplug fork lift
- 1838 Gerardo to Ends to take pictures
- 1853 Hugh out
- 1854 Chris out
- 1900 Dick and Marc out
- 1900 Robert out and heading to EY
- 1910 Richard, Cheryl, Patrick, out
- 1936 Vac crew leaving EY
- 2056 Robert leaving EY
- 2057 Observing
- 2201 Lock loss
- 2210 Chandra, Camilla to EX to turn off turbo pump
- 2230 Chandra, Camilla back