Apollo crew
We installed the ham install arm and attached the elevator. Moved a stairway from ham 7 area where it was tested and approved by Jodi and Cheryl for use at ham 2-3. Began assembly of the work platform around bsc 2, several different configurations to choose from (and of course a galled bolt here and there). Will continue the work platform saga tomorrow. ICC at bsc 10 going quite well, brushing complete down to floor and started removing floor to begin brushing below.