TITLE: 03/11 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Aligning
INCOMING OPERATOR: Jim
SHIFT SUMMARY: Strong winds have hampered some of our commissioning and relocking efforts. Since the most recent lock loss we have lost lock from DARM_TO DC_READOUT three times. I just finished an initial alignment and Jim will be starting to try locking gain.
LOG:
- 1544 Lock loss
- 1550 Jeff B to LVEA to find storage cans
- 1550 Tyler to EY to find tooling
- 1557 Jeff B out
- 1558 Tyler heading back
- 1627 Cheryl to LVEA to look in cabinet
- 1631 Robert to EY during reacquisition
- 1632 Cheryl out
- 1708 Karen to MY
- 1709 Kyle to MX
- 1725 Robert done at EY
- 1728 Observing
- 1751 Lock loss
- 1811 Karen done
- 1831 Karen to MY
- 1841 Observing
- 1913 Robert to EY
- 1920 Commissioning
- 2028 Gerardo to MX
- 2030 Lock loss
- 2042 Gerardo back from MX
- 2235 Starting initial alignment