kyle.ryan@LIGO.ORG - posted 15:22, Tuesday 17 March 2020 (55661)
WP #8569 postponed
This would have entailed taping the existing annulus thru holes on the old HAM4 septum plates that are bagged and stored on a pallet in the LVEA. This work was postponed as the taps need to be Class-B cleaned.