Displaying report 1-1 of 1.
Reports until 08:42, Friday 20 March 2020
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:42, Friday 20 March 2020 (55691)
Ops Day Shift Transition
Ops Shift Transition: 03/20/2020, Day Shift 15:00 – 23:00 (08:00 -16:00) - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Observing
Weather:  Skies are partly cloudy, with no rain in the forecast. The temperatures currently are in the mid-30s, Winds are CALM  
Primary 0.03 – 0.1Hz: 0.009um/s
Secondary 0.1 – 0.3Hz: 0.9um/s
Outgoing Operator: Corey
Quick Summary: The IFO has been Observing for the past 38 hours. The range is 119.9Mpc. All looks good at this time.

 

Displaying report 1-1 of 1.