Work platform assembled around BSC 2 and clean room in position over both. It is starting to look like the most likely position for the E - module is going to be in the beer garden. ICC continuing with first vacuum complete and 25% of wipe down. Generally 2-3 wipes are sufficient, which is better than I had expected.