State of H1: Locked at NLN
Intent Bit: Commissioning
Support: N/A
Incoming Operator:
Shift Summary: IFO was locked for the second half of the shift. All quiet. No problems at this time.
Activity Log: Time - UTC (PT)
23:00 (16:00) Take over from Corey
23:31 (16:31) Lock loss – Commissioning
23:40 (16:40) Robert – Back from End-Y until IFO relocks
00:40 (17:40) Robert – Leaving the site
00:26 (17:26) Run Initial Alignment
00:47 (17:47) Initial Alignment complete – Trying relocking
01:22 (18:22) Relocked at NLN
02:13 (19:13) GRB Short Alert – No in Observing – Ignored
07:00 (00:00) End of Shift