TITLE: 03/28 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Commissioning INCOMING OPERATOR: Jeff SHIFT SUMMARY: Locked at NLN entire shift. Robert on site for PEM measurements. No issues. LOG: 16:00 UTC (09:00 Local) Robert on site 18:29 UTC (11:29 Local) Robert to end Y 21:03 UTC (14:03 Local) Robert back for lunch