Started the shutdwon of the end stations after Jason shut off the PSL. My first was a test of the interlock system. I pushed the kill button in the control room, Patrick T. restored the safety and I verified the lasers wer off.
EX-
- Photon Calibrator CryistaLaser- Key Removed
- ALS Laser- Key Removed
- HWS Source - Power removed and knob turned to off
- HWS Camera- Power supply on floor powered off.
- ESD- Both High Voltage supply and +-18,+-48Vdc supply also shut down.
EY-
- Photon Calibrator Crystalaser- Key Removed
- ALS Laser- Key Removed
- HWS Source- Not in place
- HWS Camera- Power supply on floor powered off
- ESD- Both High Voltage supply and +-18,+-48Vdc supply also shut down.
Corner Station-
- Turned off High Voltage Power supplies on Mezzanine
- ESD Power supply off
- PSL+-150 VDc +375VDc Powered Down
- Sqeezer TTFFS HV pwered off
- Ham 6 Shutter HV powered off
- Ham 6 PZT powered off
- TCS X and Y 100V Power Supply powered off.
- PSL- Make up air on PSL turned up to 100%
- TCS-Y- Key Removed Power supply in Mechanical Room off. RF-40.668MHz off
- TCS-X- Key Removed Power supply in Mechanical Room off. See RF above
- Squeezer Laser- Key removed
- HWS X-Y camers- Power supply under table off
- HWS X-Y Sled- Off by MEDM