H1 SEI (SEI)
jeffrey.bartlett@LIGO.ORG - posted 12:03, Wednesday 01 April 2020 (55842)
Bi_weekly HEPI Fluid Check (FAMIS #13500)
   Checked the CS HEPI pump skid and fluid reservoir. 

   Fluid Level 6 3/16 - Down 1/16 from last check. Trip level is at 1/16. The fluid level was down by 1/16 on 03/24/20 as well. At this rate of loss, it will about two weeks before the CS HEPI shuts down. 
   
   Discussed with Hugh. 

   Dis not check the end stations due to COVID-19 considerations. 

Closing FAMIS #13500