Checked the CS HEPI pump skid and fluid reservoir. Fluid Level 6 3/16 - Down 1/16 from last check. Trip level is at 1/16. The fluid level was down by 1/16 on 03/24/20 as well. At this rate of loss, it will about two weeks before the CS HEPI shuts down. Discussed with Hugh. Dis not check the end stations due to COVID-19 considerations. Closing FAMIS #13500