Reports until 15:44, Tuesday 26 February 2013
H1 AOS
jodi.fauver@LIGO.ORG - posted 15:44, Tuesday 26 February 2013 (5585)
BSC10 ICC
Vacuum-wipe down-vacuum complete. Inspection underway: it should be completed by the end of shift. FTIRs and installation of permanent BSC flooring tomorrow.
Logistical problems trying to get a cleanroom from the cleaning area into the VEA to cover the dome. Randy is taking a look at the situation. 
We started hauling ICC/staging gear back to the corner.