Vacuum-wipe down-vacuum complete. Inspection underway: it should be completed by the end of shift. FTIRs and installation of permanent BSC flooring tomorrow. Logistical problems trying to get a cleanroom from the cleaning area into the VEA to cover the dome. Randy is taking a look at the situation. We started hauling ICC/staging gear back to the corner.