I'm attaching trends of the RX/RY location monitors for the BS ISI and HEPI. The beginning of the timeseries overlaps the end of the run and ends today. The jump in the locations in the middle is the platform being put to bed for the shutdown, with the earthquake being about a third of the way from the beginning of that time.
The main take away is the tilts of the platform aren't really any different now than they were before the shutdown. The 40 urad on/off rotation for HEPI is large, about 2x as big as the on/off shifts I've seen on the other BSCs.