WP 8591
Issues with LSB access sytem required onsite work. Control panel was power cycled. Carlos was able to log in and check system was back online.
Took opportunity to power on the low and high voltage for the ESD SUS at EX. Measurements to be made by Rahul require the HV voltage.
F. Clara, R. McCarthy, C. Perez
ESD HV supplies are off again.