Reports until 16:12, Monday 20 April 2020
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:12, Monday 20 April 2020 - last comment - 17:45, Monday 20 April 2020(55932)
Ops Day Shift Summary
Ops Shift Log: 04/20/2020, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked/Unknown
Intent Bit: Out of Observing
Support: N/A
Incoming Operator: N/A
Shift Summary: All is well. No problems to report at this time.
 
Activity Log: Time - UTC (PT)
15:00 (08:00) Start of Shift
17:00 (10:00) Cheryl – Doing TFs for the IM suspensions
17:20 (10:20) Spoke with Hugh about the End-X HEPI pump.
          Will discuss response at the afternoon meeting
17:28 (10:28) Rahul – Doing TFs for the OM, OPO, and ZM suspensions
18:13 (1:13) Patrick – Upgrading End-X HEPI to TwinCat3 (WP #8609)
23:00 (16:00) End of Shift
Comments related to this report
patrick.thomas@LIGO.ORG - 17:45, Monday 20 April 2020 (55933)
Sorry, not upgrading HEPI to TwinCAT3. Using the machine that is currently running the IOC for the HEPI pump controller at end X to run scripts that convert TwinCAT2 libraries to TwinCAT3. No changes to the HEPI code.