Displaying report 1-1 of 1.
Reports until 22:14, Wednesday 27 February 2013
H1 IOO
cheryl.vorvick@LIGO.ORG - posted 22:14, Wednesday 27 February 2013 (5603)
IO work in HAM2 Continues:
- Deepak, Kyohei, Travis, Cheryl

More dog clamp swaps and installation of components.  Some components were moved to allow new hardware installation in HAM2 .

Highlights of work completed:
- PRM AR Baffle installed
- PRM EQ Stop Baffle installed
- MC3 EQ Stop Baffle dog clamps swapped
- dog clamp mess in front of IM1 cleared up, though one baffle now has dog clamps only on one side, which is not ideal, so maybe some small changes still to come there
- dog clamp serial numbers and types collected

Still to do:
- modify IM4 baffle - didn't fit today, but slop in washers used as spacers may allow a fix
- FI rejected beam dump needs to be assembled and installed
- a few dog clamps to work on, less than 5
- OpLev optic still to install on North side of the table
- move one baffle, which requires climbing into the chamber on the South side
- pictures of the changes
- check alignment of every component!  Components moved without an alignment beam, so minor adjustments may be needed on multiple components.
Displaying report 1-1 of 1.