Reports until 17:50, Thursday 28 February 2013
H1 IOO
cheryl.vorvick@LIGO.ORG - posted 17:50, Thursday 28 February 2013 (5618)
Steps to locking the IMC in air:
Today the Apollo crew installed platforms of HAM2 East and West doors.  Bubba and I determined yesterday that the original platform prototype would not block our IMC REFL or IMC Trans beams, if installed on HAM2 West.  The IOT2L table was moved to a position that isn't the one marked by the red tape, but rather where I think the table needs to go to catch the beams and keep the table enclosure outside of the clean room.

Michael says the PSL laser is back, so tomorrow at min. I would like to flash the IMC.  

If it's possible to hook up the electronics at IOT2L tomorrow, I would try to lock the IMC in air.