Installed: - all baffles are on the table in a position that will only change slightly to align to the beam - all dog clamps are swapped/added on all components, except - IM1-3 dog clamps have been OK'd by Guido, but Calum wants to,see BK hammering test data, however - IM1-3 sus vs sys dog clamps are likely about the same weight, and IMs aren't moving To Do: - vet sus dog clamps with BK hammering test Desired work: - if possible, float and ballance the table and relock, to vet the table alignment and elliminate it as a block to locking the IMC in air