Reports until 07:51, Monday 04 March 2013
H1 IOO
cheryl.vorvick@LIGO.ORG - posted 07:51, Monday 04 March 2013 (5637)
IO HAM2 Status:
Installed:
- all baffles are on the table in a position that will only change slightly to align to the beam
- all dog clamps are swapped/added on all components, except
- IM1-3 dog clamps have been OK'd by Guido, but Calum wants to,see BK hammering test data, however
- IM1-3 sus vs sys dog clamps are likely about the same weight, and IMs aren't moving

To Do:
- vet sus dog clamps with BK hammering test

Desired work:
- if possible, float and ballance the table and relock, to vet the table alignment and elliminate it as a block to locking the IMC in air 