HughR, MitchR, JimW
Yesterday morning, TeamSEI finished most of the prep work for the BSC2 cartridge install. Lifting pads were added, cables were disconnected and tucked away, the ISI was checked for leftover tools, CPS racks were removed, and the walking plates cleared. A check on the underside is still needed, for more loose tools and to make sure we are not still bolted to the stand, but otherwise ready to go, IAS work still pending.