Day summary for Friday
Some of today's activity:
Gerardo closed GV15 at 8:45 AM and opened it at 3:30 PM. Nothing unusual appeared on nearby gauges.
Apollo removed the HAM 3 door this morning. Robert inspected the chamber before yielding to IAS.
Guido and Joe installed a PSL - HAM1 light pipe. RIchard put a lock and tag on it.
Richard transitioned the LVEA to laser safe at 11:15 AM. The LVEA remains laser safe.
Pablo stored the PCal aliagnment laser in the LVEA near the H2 PSL.
CDS rebooted the H1 DAQ after removing the slow channels associated with an unstable PSL ENV Windows machine.
Dust monitor 4 has displayed a "low battery" warning all day, and dust monitor 1 has displayed "calibrate failure" all day.
Work permits signed by ops today: HAM 3 clean room cleaning (completed early this morning).