Some of today's activity:
-
Gerardo closed GV15 at 8:45 AM and opened it at 3:30 PM. Nothing unusual appeared on nearby gauges.
-
Apollo removed the HAM 3 door this morning. Robert inspected the chamber before yielding to IAS.
-
Guido and Joe installed a PSL - HAM1 light pipe. RIchard put a lock and tag on it.
-
Richard transitioned the LVEA to laser safe at 11:15 AM. The LVEA remains laser safe.
-
Pablo stored the PCal aliagnment laser in the LVEA near the H2 PSL.
-
CDS rebooted the H1 DAQ after removing the slow channels associated with an unstable PSL ENV Windows machine.
-
Dust monitor 4 has displayed a "low battery" warning all day, and dust monitor 1 has displayed "calibrate failure" all day.
-
Work permits signed by ops today: HAM 3 clean room cleaning (completed early this morning).