For the record, this afternoon, Travis aligned the lower stage AOSEMs of the PR2 now that it is aligned. He also cleaned out tools from the chamber. I spent some time cleaning with isopropanol and contec wipes some of the horizontal surfaces from the south end of the chamber, namely the ISI table and the floor and bellows near the cat-eye baffle.