TITLE: 04/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: Got further in locking today. Commissioners have taken calibration measurements and CARM loop. We've had a fair few locklosses today, described and linked below. Currently at LOWNOISE_ESD_ETMX.
LOG:
- 15:36 - 21:10 Hugh onsite - Mechanical room inventory
- 16:11 Lockloss #1 1302624690
- Locking after this lockloss detailed by alog 58620
- 16:39 - 17:00 Marc into LVEA to plug network analyzer into Common mode board
- 18:11 Took Calibration Actuator TFs
- 19:24 Lockloss #2 (looked similar to #1) 1302636280
- 20:20 Jeff K taking Calibration Sensing TFs
- 20:26 Marc into LVEA to adjust connections of network analyzer to Common mode board.
- CARM measurement taken.
- Unplugged before leaving incase it effects locking.
- 20:40 Lockloss #3 saturating ETMX L2 1302640848
- 21:10 Mitchell taking forklift OSB <-> Staging
- 21:21 Lockloss #4 saturating ETMX L2 - blame coil drivers? 1302643287
- 22:03 Lockloss #5 saturating ETMX L2 1302645858