Reports until 17:06, Friday 22 March 2013
H1 SEI
hugh.radkins@LIGO.ORG - posted 17:06, Friday 22 March 2013 (5870)
WBSC2 ISI Cabling Status

All the ISI cabling has been dressed and run to the feed-thrus.  They are connected to the feedthrus; some but not all are disconnected from the sensors.  The racks are currently off.  We will perform emulation check outs before the sensors are wired and powered.  This should go quickly.  The baffles are not hung but can be now.

Please do not power on the BSC2 ISI seismometer racks.  The CPS are on but all others are off and should remain so.  A few images below for the ages.

Images attached to this report