- Pablo and Michael, Pcal assembly work inside the "assembly" room in the LVEA.
- Apollo crew craned several items over XBM.
- Filiberto and Sheila, Removal of frequency discriminator at Y-End.
- Sheila, install frequency discriminator at Y-End.
- Michael R., is working on bringing the H1 PSL back, unknown cause as to why it failed, Michael is investigating now and trying to bring it back, as of now he continues to work inside the H1 PSL room.