bubba.gateley@LIGO.ORG - posted 15:43, Thursday 28 March 2013 (5916)
Apollo crew
We assisted Pablo with P-Cal fixtures today in the H-2 PSL enclosure and craned the dirty parts over the X arm for Michael Rodruck, and into the LEA on pallets. John and I cut the coupons out of the show and tell beam tube out at the weld shop, I will bend them next week at the Apollo shop. Viewports VPA2F1 &VPA2F4 were installed and torqued on HAM 1. Started installation of viewport G2 on BSC 2, will complete tomorrow. We wraped and transported 4 TMS Optical tables from EY to EX. We reajusted the lower limit on the EX crane so the hook and block do not contact the floor. We relocated IOT2 table from the east bay to the south bay near HAM 2 for Joe Gleason and Cheryl Vorvick and installed the viewport simulator for Cheryl.