MitchR, JimW, w/ Apollo Chris and Zach
The BSC2 ISI was locked and covered this morning in preparation for the Wed-Thurs power outage. The cover consists of one new BSC Dome Tall cover, a layer of ameristat taped down to the walking plates and a final BSC Dome Cover. Travis is in putting a cover on the locked SUS now. We might be going in again later, to lock HEPI, but otherwise the chamber is ready to be closed up.
The beamsplitter now has a C3 cover. From a SUS perspective, the chamber is ready to be closed.