H1 SQZ
sheila.dwyer@LIGO.ORG - posted 18:14, Friday 23 April 2021 - last comment - 12:51, Monday 02 August 2021(58724)
summary of VIP status

Several documents that are usefull references for the VIP build are collected in the dcc here: D1500302

Summary of what has already been done, for reference:

Things that still need to be done:

Comments related to this report
keita.kawabe@LIGO.ORG - 12:51, Monday 02 August 2021 (59515)

For posterity, useful numbers for the final matching measurement for the FC path are:

  Horizontal Vertical Target
Waist Radius [um] 217.6 210.04 202.7
WaistRad (meas-target)/target 0.0736 0.0363  
Waist Position [mm from A:M3] 171.5 171.2 185.2
WaistPos measured-target [mm] -13.7 -14.0  
Rayleigh range [mm] 139.8 130.3 121.3
WaistPos(measured-target)/2/Rayleigh(target) -0.0564 -0.0577  
Matching [%] 99.2 99.6  

 