Today, Travis and I pulled the ITMX-HR FIrstContact cleaning layer and inspected. With bright light it was difficult to find many particulates in the main area of the center of the optic which was good. We fully suspended the 8 locked QUAD masses and returned the ACB back to it's nominal position (removed locking bracket and wedge). We then inspected the ITMX OPLEV laser transmitter and receiver beam with respect to the new nozzle baffles, and also check to confirm that for this ITM, the optical lever readback SUM is the same as it was before the locking episode. So all good there. A few quick TFs identified that I left a stop rubbing on the CP top barrel which Travis found, but the TFs look better now. Wafers are down in the chamber and we swept for tools, etc.
Nidhi is finishing the ITMY SUS TFs.
Jim is going to try to run ISI TFS of ITMX, ITMY, and the BS tonight.