H1 CDS
david.barker@LIGO.ORG - posted 15:15, Thursday 04 April 2013 (5973)
Power Outage Recovery started

Following the site wide power outage from 9am Wed 3rd to 11am Thurs 4th April we are presently recovering the CDS systems.

At this point, we have started all the vacuum controls racks, the networking systems and the FMCS systems. A full recovery procedure will be posted in the DCC when we have completed the startup.