- John Worden convened the morning meeting. - Jodi Fauver reports that the results of the Astro Pak cleanness tests were very good. - Terry Santini / Doug Cook declare that the LSB Fiber Lab area is now a clean (garb-required) area, and is signed accordingly. - Work at BSC7 on HEPI installation. - Surveying by H2:PSL area for HAM transfer. - Swagelok delivery for Hugh Radkins. - EX and MY are in a "rough vacuum" for BSC transfer. - New cubicles being installed in OSB, CAD workstations moved to the east cubicle farm in the OSB.