Reports until 16:48, Monday 15 April 2013
H1 SUS
arnaud.pele@LIGO.ORG - posted 16:48, Monday 15 April 2013 - last comment - 16:24, Tuesday 25 March 2014(6014)
B&K PRM PR2 PR3 MC1 MC3

B&K hammer test was made monday and tuesday last week with Betsy and Travis on HAM2 and HAM3 chamber for MC1-MC3-PR3-PRM-PR2 suspensions

The measurements have been taken with :

Pictures attached are showing position of the tri-axis accelerometer, and hammer hit locations for : 

The following pdf document shows the different measurements, with comparisons between VA on / off for PR3 and PRM, and comparisons between LLO and LHO measurements.

As required for the ISI tables, resonnances of the structure below 150Hz (marked by the black dotted line) are damped by the vibration absorbers (page 9 to 12 to see their effects on PRM and PR3)

Data have been exported and plotted following the operations manual wikipage.

Images attached to this report
Non-image files attached to this report
Comments related to this report
arnaud.pele@LIGO.ORG - 16:24, Tuesday 25 March 2014 (10997)

Label on the first picture should be MC1 and not MC3.