GregG, JimW
After IAS gave a thumbs up on the BSC2 alignment, Greg and I started attaching the vertical HEPI actuators. With relatively few hiccups, all four actuators were attached. Shifts were relatively small at the dial indicators (all less than .003"), but we'll confer with IAS to make sure we haven't screwed up too bad. Horizontal actuators are up next, should be able to finish by this time tomorrow.